X

MMEA

Phoenix Rising, OPV 2 and OPV 3

SHAH ALAM: Work for the completion of OPV2 and OPV 3 are still planning in the stage. MMEA director-general Rear…

German Design Out, Part 2

SHAH ALAM: In the previous post, German Design Out, Malaysian Defence wrote that the stranglehold of the Fassmer design on…

German Design Out, Turkish in for MPMS project

SHAH ALAM: IT appears that the strange obsession with ship designs from Fassmer, a shipbuilder from Germany with the Malaysian…

MMEA Patrol Boat Caught Fire

SHAH ALAM: KM Stapa - pennant number 2602- caught fire while undergoing maintenance at a shipyard in Miri, Sarawak last…

Tender For MMEA RHFB

SHAH ALAM: The Procurement Division of the Home Ministry has issued a 21-day tender for the supply and delivery of…

More Details on MMEA Repowering and Refit Programme

SHAH ALAM: In the previous article on the first MMEA boat to under the re-powering and refit programmer (RRP), there…

MMEA First Ship Completes Its Repowering and Refit

SHAH ALAM: In his 2025 budget speech, PMX DS Anwar Ibrahim said six MMEA ships will undergo a repowering and…

2025 National Security Budget. Updated

SHAH ALAM: PMX DS Anwar Ibrahim today announce an allocation of RM40.6 billion for the national security sector from the…

MMEA To Take Cutter Delivery By Year End

SHAH ALAM: MMEA is expected to take delivery of its first cutter -gifted by the United States - by the…

Its Leased AW149s for RMAF

SHAH ALAM: The government has decided that RMAF will operate at least twelve Leonardo AW149 utility helicopters under a leasing…