Phoenix Rising, OPV 2 and OPV 3
SHAH ALAM: Work for the completion of OPV2 and OPV 3 are still planning in the stage. MMEA director-general Rear…
SHAH ALAM: Work for the completion of OPV2 and OPV 3 are still planning in the stage. MMEA director-general Rear…
SHAH ALAM: In the previous post, German Design Out, Malaysian Defence wrote that the stranglehold of the Fassmer design on…
SHAH ALAM: IT appears that the strange obsession with ship designs from Fassmer, a shipbuilder from Germany with the Malaysian…
SHAH ALAM: KM Stapa - pennant number 2602- caught fire while undergoing maintenance at a shipyard in Miri, Sarawak last…
SHAH ALAM: The Procurement Division of the Home Ministry has issued a 21-day tender for the supply and delivery of…
SHAH ALAM: In the previous article on the first MMEA boat to under the re-powering and refit programmer (RRP), there…
SHAH ALAM: In his 2025 budget speech, PMX DS Anwar Ibrahim said six MMEA ships will undergo a repowering and…
SHAH ALAM: PMX DS Anwar Ibrahim today announce an allocation of RM40.6 billion for the national security sector from the…
SHAH ALAM: MMEA is expected to take delivery of its first cutter -gifted by the United States - by the…
SHAH ALAM: The government has decided that RMAF will operate at least twelve Leonardo AW149 utility helicopters under a leasing…