How Much Is That LMS Batch 2 in the Window?
SHAH ALAM: As Malaysian Defence reported previously, the plan for the LMS Batch 2 was for eight ships to be built within two RMK with a budget of RM2.5 billion. That plan was tweaked in 2022 – as it was apparent that the government will continue funding the LCS and […]