X

Gempita, Nexter LG1 Deliveries and More

MD530G Block II. MD Helicopters

SHAH ALAM: Gempita, Nexter LG1 Mk II 105mm guns deliveries and more. It appears that the Army has taken delivery 17 out of 18 Nexter G1 Mk III 105mm guns last year and one more is expected this year. The numbers was revealed by Senior Minister for Security DS Ismail Sabri in his 2021 message to the Armed Forces on January 18.

Apart from the Nexter guns, Ismail said the military also took delivery 25 Gempita ACVs and two field hospitals in 2020. The military also took delivery 11 rigid hull inflatable boat (RHIB) and one multi-purpose boat, both for the RMN, ordered to meet with the urgent operational requirement of Op Benteng.

Nexter 105LG1 gun displayed at DSA 2018

He left out the delivery and commissioning of KD Keris, the first China made Littoral Mission Ship (LMS). Yes technically, Keris was delivered on December 31, 2019 but her physical delivery was made on January 17, 2020.
The cockpit of the MPB undergoing testing. RMN Eastern Fleet.

As for 2021, apart from the sole Nexter gun, the military will take delivery of 37 Gempita, three LMS – Sundang and two other unnamed ones – and six MD Helicopters MD530G light scout attack helicopters.
The new Paskal RHIB being put on to its paces. RMN chief Admiral Reza Sani was onboard, hence the four star flag. RMN

The military will also be getting six Fast Interceptor Craft (FIC), 63 one tonne GS cargo trucks and 27 all terrain vehicles, also procured under Op Benteng.
Gading Marine FAC PC 31.

In 2021, the ministry plans to continue with the procurement of 15 new assets for the military. This involved the Army land and water mobility programmes, light combat aircraft, aviation ground support vehicles and equipment, fire engines, firepower and special forces equipment and air defence radars
Weststar GK-M1 Fitted for For Radio at the Army alert battalion parade in February. The first vehicle in the lineup carry the ZC 4062.

Eight new military camps will also be built this year, four in the peninsula and two each in Sabah and Sarawak. Eight border posts will also be built, two in the peninsula and Sabah and four in Sarawak. Under the ministry’s plan, 21 border posts will be built until 2023 starting this year. Despite what was announced above I still believed the LCA programme will be delayed until the RMK12 budget has been approved by Parliament. And there is nothing about the elephant in the room…..

— Malaysian Defence

If you like this post, buy me an espresso. Paypal Payment
Marhalim Abas: Shah Alam

View Comments (18)

  • I heard Mindef will go ahead to get 36 in 2 batch LCA/Flit and ditch plan of getting ISF@Hornet from Kuwait AF and any opportunities to get ex Australian Tigers since their replaced it with the Apaches...

    Reply
    There was never an official plan to get the Kuwaiti Hornets just rumblings. No plans as well to get the Oz Tigers

  • The Gempita delivery...is it based on the previous contract of 257 Gempita or is it additional being purchased by the army

    Reply
    Its the old one

  • why exactly would you want those tiger? The ozzies retire them (prematurely) for a reason. if they couldn't fix it why do you think we can?

  • Just wonder why delivery 17 Nexter 105LG last year and now left 1 to deliver? Is it got defect or it go through some kind of testing and need to re-setup?

    Reply
    No idea, its likely due to Covid

  • Any news on the heli leasing to replace the Nuri? I hope they get at least 12 example dry lease for general transport and supply in 2021

    Reply
    Nothing yet. It won't be 12

  • Dundun - “exactly would you want those tiger”

    Apart from procurement and operating costs; we’d also have to formulate a doctrine specific to our needs and ensure whatever we buy is networked.

    Dundun - “. if they couldn’t fix it why do you think we can?”

    They decided that another type would best suite their long term needs. Not all the issues encountered with the Tigers would be an issue with us as our requirements (should we ever buy any gunships) would differ considerably to that of the Australians.

    Fadiman - “any opportunities to get ex Australian Tigers since their replaced”

    To first get something there must be an operational requirement and approval has to be gained. There is no immediate requirement for gunships ....

    Lee - “hould get more Nexter 105mm guns to replace the pack howitzers”

    There are a lot of things we “should” get. The priority - as far as guns go - is a 155mm SPH. Whether or not having an additionally 155 regiment will lead to a reduction in 105mm regiments remains to be seen.

    As it stands: the Artillery Directorate - if given a free hand - would like to replace the Model 56s but not on a one to one basis; preferring to raise the number of 155mms operated.

    This is because for a lot of things we’d like our arty to do; 105mm guns have inherent limitations. This is unlike the case in the past when they served our needs; at a time when we weren’t focused largely on external security.